CooperLux & Google OAuth Access Gate: Sign in with an authorized cooperlux.com or Google allowlist account to access full Staged Home Power schematics, battery restoration logs, and NEC 702/706 checklists.
← Back to Portal Home CooperLux SSO
SEC-04 · ENERGY & POWER SYSTEMS

Staged Home Power (Stages 1–3), Battery Restoration, Wind, Micro-Hydro & Wireless Power

Compiled from the October 30, 2026 Energy Deep Dive, Battery Restoration Procedures (P-001 to P-004), NEC Article 702 / 706 standby code path, NYSDEC Article 15 stream rules, and the P-006 Through-Barrier Wireless Power Ladder.

24V 600W
Stage 1 Currie XYD-13 PM Generator Bench
14.2V / 2.0V
Decided Gel Charge Stop & Lithium Cell Cutoff
5000/6250W
Stage 3 Coleman Standby via Listed Interlock
7 Inches
Max Distance from Battery + Post to DC Fuse

1. Staged Home Power Plan (Stages 1 to 3) & Battery Bank Triage

Dane-Executed Code Path · Lockout, Grounding, GFCI & Listed Transfer Equipment
Stage / Procedure Hardware & Inventory Assets Engineering & Code Specification Instrumentation & Safety Rules
Stage 1: 1–10 W Bench & PM Generator
P-004 · P-011
Currie Electro-Drive XYD-13 (24V, 600W PM DC motor, INV-0305), primitive Cu/Zn cell array, 100A/75mV shunt (P-011). Characterize open-circuit voltage vs. RPM (DT2234C+ tach) and loaded efficiency curve across resistive dummy loads. Log V, I, and W continuously with Fluke 287 + Fluke i1010 clamp.
Stage 2: 12V / 24V Battery Bank Restoration
P-001 to P-004 · SP-10
Matched 6-DZM-18 (12V 18Ah gel pair, INV-0340), NAPA 6565 flooded lead-acid, Korad KA3005P programmable CC/CV supply. Decided Thresholds: Gel charge stop = 14.2 V; Lithium cell low-voltage cutoff = 2.0 V. Install rated DC fuse within 7 inches of every battery positive post + master battery disconnect switch. Ventilate hydrogen during lead-acid charging. Per NYC Admin Code 309.3.5 & NY GBL 495-a, reconditioned lithium packs are strictly for in-house bench use (never sold).
Stage 3: NEC 702 Optional Standby Backup
NEC 702 · NEC 706
Coleman Powermate 5000 / 6250W portable generator (INV-0412), listed mechanical breaker interlock or transfer switch, outdoor flanged power inlet. Step 1: Clamp service conductors with Fluke i1010 + Fluke 287 for 7 days to record true peak demand.
Step 2: Connect generator strictly via listed transfer switch or breaker interlock (NEC 702); NEC 706 for battery ESS.
Never backfeed without listed transfer equipment. Operate generator outdoors minimum 20 ft from any window/door opening with working CO alarms active.

2. Wind, Micro-Hydro, Qi Through-Barrier Wireless Power & Plasma Acoustics

Honest-Physics Measurement Protocols & NYSDEC Article 15 Compliance
Energy Domain Technical Protocol & Regulatory Gate Required Bench / Field Verification
Wind Turbine Assessment
Hub-Height Logging
Wind power scales with cube of velocity (P ∝ v³). Small roof-mounted turbines suffer severe turbulence losses; log hub-height wind speed for 2–4 weeks with a logging anemometer before erecting any mast. Every PM wind/hydro charge controller MUST include an automatic diversion dump load so the rotor never spins unloaded into over-voltage/overspeed.
Micro-Hydro Assessment
NYSDEC Article 15
Any intake, weir, or penstock work that disturbs the bed or banks of a protected stream (Class AA, A, B, or C(T)) requires an NYSDEC Protection of Waters (Article 15) permit. Perform dry-season bucket/weir flow measurement and static head survey first to calculate true continuous hydraulic watts (P = η · ρ · g · Q · H).
Qi Through-Barrier Wireless Power Ladder
P-006 · Track W
Stepped inductive / resonant coupling characterization through non-metallic wood, glass, and cast-resin barriers (1 mm to 25 mm spacing). Measure DC-to-DC transfer efficiency and coil surface temperature at each spacer increment using Fluke 287 and Rigol DHO804.
Earth-Current & Plasma Acoustics
BP-109 · Rule 7
Telluric / earth-battery pairs yield microwatts to milliwatts (electrochemical + ground-potential instrumentation demos). Plasma acoustics (BP-109) modulates high-frequency arc/corona inside a Faraday-screened cage. State all input/output losses transparently (Rule 7: zero free-energy claims); ozone ventilation & UV eye protection mandatory for BP-109.

Energy Systems Walkthrough & Load-Audit CRM Agent

Step through Stages 1–3 or log battery voltage readings, shunt curves, and 7-day clamp load audits.